TRENDING :
#
civil
#
lok sewa aayog
#
psc
#
public service commission
#
Assistant Sub Engineer
#
sub engineer
#
government services
#
5th level
HOME
PSC
MCQ
MOCK TEST
SUBJECTIVE
OLD QUESTION
E-LECTURES
Construction Tech. & Workshop
Building Const. & Drawing
Highway Engineering
Water Supply and Sanitary Engineering
Geo-Technical Engineering
Q-BANK (9-12 )
CLASS-9
CLASS-10
CLASS 11
CLASS-12
CIVIL FACTS
National
International
CIVIL ENGINEERING
Survey
Highway
Building Construction
Construction Material
Estimating & Costing
Water Supply & Sanitation
Irrigation
BLOG
HOW TO
COLLEGE
NEWS
Privacy Policy
Gandaki Pradesh 5th Level Subjective Question Solved
Bagmati Pradesh 5th Level Subjective Question Solved
5th Level Civil Sub Engineer Solved – Koshi Pradesh
What are the function of septic tank? Draw a schematic diagram of a septic tank showing its main components.
Explain in brief the design consideration in two way slab according to IS code.
Describe under reinforced, over reinforced and balanced RCC sections.
Differentiate between weir and notch. Explain their uses.
Introduce pressure energy, kinetic energy and potential energy in pipe flow.
Write down the advantages and disadvantages of irrigation.
Describe about different types of estimates of civil works.
1
2
Next Page »
POST
Gandaki Pradesh 5th Level Subjective Question Solved
Bagmati Pradesh 5th Level Subjective Question Solved
5th Level Civil Sub Engineer Solved – Koshi Pradesh
How to Become a Perfect Civil Engineer: A Roadmap to Success
NEB Grade-12 Chemistry Exam 2079
NEB Grade-12 (Supplementary Exam 2081 Fluid Mechanics)
NEB Grade-12 (Supplementary Exam 2081 Mechanics of Structure)
NEB Grade-12 (Supplementary Exam 2081 Mathematics)
NEB Grade-12 (Supplementary Exam 2081 Physics)
7.5 Bituminous Road, Field Construction Procedures